Shelly O'Neil November 17, 2026
Have you driven down La Costa Avenue lately and noticed something different on the lagoon? On Monday, November 9, trains stopped running on a wooden bridge that had carried them across Batiquitos Lagoon since the 1940s. They now cross a brand-new concrete bridge right next to it.
If you ride the Coaster, walk the lagoon trail, or live anywhere near the tracks between Carlsbad and Encinitas, here's what changed, why it matters, and what's coming next along our coast.
The new bridge is part of SANDAG's Batiquitos Lagoon Double Track project. It covers a short but important stretch, about six-tenths of a mile from La Costa Avenue in Encinitas to just north of Avenida Encinas in Carlsbad (SANDAG).
The project costs $166 million, with about $111 million of that going to construction. It's paid for with federal and state grants plus TransNet, San Diego County's half-cent sales tax for transportation (Union-Tribune via Mass Transit). Work started in August 2024, and KPBS reports it's about 75% done.
Right now there's one new bridge. With trains off the old wooden trestle, crews can take it down, and a second bridge will go in where it stands today. SANDAG expects the whole project to wrap up in 2028.
In spots like this, our coast rail line has only one track, so trains have to take turns. A second track lets northbound and southbound trains pass each other and lets passenger trains get around slower freight trains. It also means crews can work on one track while trains keep running on the other (SANDAG; KPBS).
The rail line runs 60 miles through San Diego County. About 44.8 of those miles already have two tracks, and SANDAG's goal is all 60 miles by 2035. Once this project is finished, it will link into more than five miles of continuous double track through Encinitas and south Carlsbad.
This line matters well beyond commuters. It's San Diego's only rail connection to the rest of the country, and about $1 billion in goods moves on it every year (KPBS).
The new bridge has longer spans and fewer supports in the water, so the tide can flow in and out more easily. That helps water quality and the wetland itself.
Batiquitos Lagoon is also home to the California least tern, an endangered bird, with about 400 to 600 nests a year, according to the state Department of Fish and Wildlife as cited by the Union-Tribune. Construction stops every year from April 15 to July 31 so the terns can nest (SANDAG).
Batiquitos is one piece of a bigger plan. Next on the list are a new bridge and second track at San Dieguito Lagoon in Del Mar, and a new double-track bridge over the San Luis Rey River in Oceanside (Union-Tribune via Mass Transit). If you live near Del Mar or Oceanside, this kind of work is headed your way.
Thinking about buying or selling in Carlsbad or Encinitas, or want a quick rundown on homes near the coast rail line? Send me a DM on Instagram at @_shelly_oneil_ with the word LAGOON, and I'll get back to you personally. You can also call or text me at 760-223-2588.
Shelly O'Neil, REALTOR® | The O'Neil Group | LPT Realty | DRE# 01722794
We're excited to connect with you and help you achieve your real estate goals. Whether you have questions about buying, selling, or investing, or you simply want to learn more about our services, we're here to provide the information and guidance you need. Let's connect today!